Revised Draft Construction Documents for Corrective Action Implementation, Building 207/231 Area, Presidio of San Francisco, California, volume 2

Cover Revised Draft Construction Documents for Corrective Action Implementation, Building 207/231 Area, Presidio of San Francisco, California, volume 2
Revised Draft Construction Documents for Corrective Action Implementation, Building 207/231 Area, Presidio of San Francisco, California, volume 2
Mactec Engineering And Consulting

On behalf of the Presidio Trust, MACTEC Engineering and Consulting, Inc. prepared this Corrective Action Implementation Work Plan (Work Plan) to implement the corrective actions at five remedial units proposed in the Building 207/231 Area Final Corrective Action Plan, Building 207/231 Area, San Francisco, California (CAP). The Building 207/231 Area comprises approximately 8 acres of land in the northeast portion of the Presidio of San Francisco, located south of the Crissy Marsh. Doyle Drive/Hig

...

hway 101 north- and south-bound overpasses bisect the Site. The purpose of the corrective actions are to achieve âclean closureâ for unrestricted reuse of the Site.

MoreLess

Read book Revised Draft Construction Documents for Corrective Action Implementation, Building 207/231 Area, Presidio of San Francisco, California, volume 2 for free

You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
Ads Skip 5 sec Skip
+Write review

User Reviews:

Write Review:

Guest

Guest