Report On Old And Hazardous Materials Site Evaluation, Piers 1, 2 And 3, Northern Avenue, Boston, Massachusetts

Cover Report On Old And Hazardous Materials Site Evaluation, Piers 1, 2 And 3, Northern Avenue, Boston, Massachusetts
Report On Old And Hazardous Materials Site Evaluation, Piers 1, 2 And 3, Northern Avenue, Boston, Massachusetts
Haley & Aldrich

...a hazardous substance evaluation of a site on the South Boston waterfront of a proposed mixed use development project bounded by Commonwealth Pier, Boston harbor, Northern Avenue and Fort Point Channel known as Planned Development Areas (PDA's) 23 and 24; includes information on site history and usage, present site conditions and subsurface conditions and water levels; also includes a chronology of significant historical (1852-1971) events affecting the site, test pit logs, results of chemica

...

l analysis, summary of laboratory soil test results and a copy of the 1875 plan for filling South Boston Flats; a copy of this item was in the BRA collection..

MoreLess

Read book Report On Old And Hazardous Materials Site Evaluation, Piers 1, 2 And 3, Northern Avenue, Boston, Massachusetts for free

You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
Ads Skip 5 sec Skip
+Write review

User Reviews:

Write Review:

Guest

Guest