Draft Battery Crosby Road Construction Report: Addendum to Construction Completion Report Baker Beach Disturbed Areas 3 And 4

Cover Draft Battery Crosby Road Construction Report: Addendum to Construction Completion Report Baker Beach Disturbed Areas 3 And 4
Draft Battery Crosby Road Construction Report: Addendum to Construction Completion Report Baker Beach Disturbed Areas 3 And 4
Treadwell & Rollo, Inc.
Between 7 December 2005 and 23 February 2006, construction of the new access road to Battery Crosby was performed. This report summarizes the reconstruction of Battery Crosby Road following remedial excavation activities performed at former Baker Beach Disturbed Area 3 (BBDA3) located in the Presidio of San Francisco, California. This report has been prepared as an addendum to the Trustâs Construction Completion Report, Baker Beach Disturbed Areas 3 and 4 (Treadwell & Rollo, 2005) dated August 2005.

Read book Draft Battery Crosby Road Construction Report: Addendum to Construction Completion Report Baker Beach Disturbed Areas 3 And 4 for free

You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
Ads Skip 5 sec Skip
+Write review

User Reviews:

Write Review:

Guest

Guest